• page banner

Factory best selling Steel Structure Prefab Bailey Bridge with Galvanization Corrosion

Short Description:

Model Alias:100-Type
Model Derived: CB100,Compact-100,British 321-Type
Bridge deck net width: 4m
Maximum Free Span length: 51M
Panel Dimension:3000MMX1400MM(Holes center distance)


Product Detail

Product Tags

Our well-equipped facilities and excellent quality control throughout all stages of production enables us to guarantee total customer satisfaction for Factory best selling Steel Structure Prefab Bailey Bridge with Galvanization Corrosion, We’re not contented with the present achievements but we have been trying ideal to innovate to meet buyer’s much more personalized needs. No matter where you will be from, we’re here to wait for your type ask for, and welcom to go to our manufacturing unit. Choose us, you can fulfill your dependable supplier.
Our well-equipped facilities and excellent quality control throughout all stages of production enables us to guarantee total customer satisfaction for China Steel Construction and Pedestrian Bridge, Now, we are trying to enter new markets where we do not have a presence and developing the markets we have the already penetrated. On account of superior quality and competitive price , we will be the market leader, please don’t hesitate to contact us by phone or email, if you are interested in any of our products.

Product elements

It consists of Chord member,MontantDiagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling

bailey bridge panel consists of pannels,pins, post end, ,bolt, chord reinforcement ,truss bolt and chord bolt.
Comprising upper & lower chord member, montant and raker welded. One end of the upper & lower chord member is female, and the other end is male, both with pin hole. While splicing the trusses, insert the male end of one truss into the female end of the other, aiming the pin hole and inserting the pin. Holes’ function of truss: chord member bolt hole is used for splicing dual deck or reinforced bridge, by inserting the truss bolt or chord member bolt into the chord member bolt hole, so as to connect the dual deck truss or the truss and reinforced chord member; brace hole is used for installing brace, while the truss is used as girder, use the two middle holes; while used as bridge feet, use the two end holes, so as to strengthen the connection of two rows of trusses; wind bracing hole is used for connecting the sway brace; brace hole on end montant is used for installing brace, raker and yoke plate; hole of transom bolt & nut is used for installing transom bolt & nut. There are four transom pads, with bolt on it for limiting the transom position.

type Bailey bridge (7)
type Bailey bridge (3)

Product application

321-Type Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.

Product advantages

Our well-equipped facilities and excellent quality control throughout all stages of production enables us to guarantee total customer satisfaction for Factory best selling Steel Structure Prefab Bailey Bridge with Galvanization Corrosion, We’re not contented with the present achievements but we have been trying ideal to innovate to meet buyer’s much more personalized needs. No matter where you will be from, we’re here to wait for your type ask for, and welcom to go to our manufacturing unit. Choose us, you can fulfill your dependable supplier.
Factory best selling China Steel Construction and Pedestrian Bridge, Now, we are trying to enter new markets where we do not have a presence and developing the markets we have the already penetrated. On account of superior quality and competitive price , we will be the market leader, please don’t hesitate to contact us by phone or email, if you are interested in any of our products.


  • Previous:
  • Next: