• page banner

High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Modular Assault Bridge, Container Rollers, Army Pontoon, If possible, be sure to send your needs with a detailed list including the style/item and quantity you require. We will then deliver our greatest price ranges to you.
High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall Detail:

Specification

Product name: Compact-100 Bailey Bridge
Model alias:  321-type prefabricated highway steel bridge (Bailey Bridge)
Derivative models: CB100, Compact-100, British 321-Type Bailey Bridge.
Truss piece model: Type 321 Bailey Panel
Conventional size of truss piece: 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side)
Maximum span of steel bridge design: 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected)
Standard lane width of steel bridge: 4.2 meters single lane (also can be customized according to customer needs)
Load class: Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design: 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR
According to the difference of span and load, select the appropriate row. Contact us for free design.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 high-strength bolts
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc.
Installation takes time: 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions)
Installation requires workers: 6-8 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions)
Steel bridge features: Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

Product elements introduction

It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.

Product application

The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.

Product advantages


Product detail pictures:

High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures


Related Product Guide:

Assume full responsibility to satisfy all needs of our clients; achieve continual advancements by endorsing the expansion of our purchasers; turn into the final permanent cooperative partner of clientele and maximize the interests of clients for High Quality Bailey Bridges Inc - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall , The product will supply to all over the world, such as: Marseille, Honduras, Singapore, What is good price? We provide customers with factory price. In the premise of good quality, efficiency will have to be paid attention to and maintain appropriate low and healthy profits. What is a fast delivery? We make the delivery according to customers' requirements. Although delivery time depends on the order quantity and the complexity of it, we still try to supply products and solutions in time. Sincerely hope we could have long term business relationship.
  • As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
    5 Stars By Adam from Jersey - 2018.08.12 12:27
    Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
    5 Stars By Antonia from South Africa - 2018.11.11 19:52