Our organization puts emphasis to the administration, the introduction of talented staff, and the construction of team building, trying hard to boost the quality and liability consciousness of workers users. Our firm successfully attained IS9001 Certification and European CE Certification of IOS Certificate China Temporary Heavey Steel Structure Portable Truss Bailey Bridge, If you are interested in any of our products or would like to discuss a customized order, please feel free to contact us.
Our organization puts emphasis to the administration, the introduction of talented staff, and the construction of team building, trying hard to boost the quality and liability consciousness of workers users. Our firm successfully attained IS9001 Certification and European CE Certification of China Temporary Bailey Bridge, Heavy Steel Structure Portable Bailey Bridge, In order to carry out our goal of “customer first and mutual benefit” in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers’ requirements. Welcome you to cooperate with us and join us. We have been your best choice.
Product name: | Compact-100 Bailey Bridge |
Model alias: | 321-type prefabricated highway steel bridge (Bailey Bridge) |
Derivative models: | CB100, Compact-100, British 321-Type Bailey Bridge. |
Truss piece model: | Type 321 Bailey Panel |
Conventional size of truss piece: | 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side) |
Maximum span of steel bridge design: | 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected) |
Standard lane width of steel bridge: | 4.2 meters single lane (also can be customized according to customer needs) |
Load class: | Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc. |
Design: | 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR According to the difference of span and load, select the appropriate row. Contact us for free design. |
Main material of steel bridge: | GB Q345B |
Connection pin material: | 30CrMnTi |
Connecting bolt grade: | 8.8 high-strength bolts |
Surface corrosion: | Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc. |
Bridge erection method: | Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc. |
Installation takes time: | 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions) |
Installation requires workers: | 6-8 (determined according to site conditions) |
Equipment required for installation: | Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions) |
Steel bridge features: | Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life |
Pass the certification: | ISO, CCIC, BV, SGS, CNAS, etc. |
Executive standard: | JT-T/728-2008 |
manufacturer: | Zhenjiang Great Wall Heavy Industry Technology Co., Ltd. |
Annual output: | 12000 tons |
It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.
The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.
Our organization puts emphasis to the administration, the introduction of talented staff, and the construction of team building, trying hard to boost the quality and liability consciousness of workers users. Our firm successfully attained IS9001 Certification and European CE Certification of IOS Certificate China Temporary Heavey Steel Structure Portable Truss Bailey Bridge, If you are interested in any of our products or would like to discuss a customized order, please feel free to contact us.
IOS Certificate China Temporary Bailey Bridge, Heavy Steel Structure Portable Bailey Bridge, In order to carry out our goal of “customer first and mutual benefit” in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers’ requirements. Welcome you to cooperate with us and join us. We have been your best choice.