In modern transportation system and technology construction, Bailey Bridges are highly prefer for their rapid construction and flexibility. Among them, the HD100 Bailey Bridge base out as a Prime Minister choice for numerous undertaking due to its exceeding load-bearing capacity and convenient installation procedure. This document purpose to present a detail, measure-by-measure usher to the installation of the HD100 Bailey Bridge, supply valuable mention and guidance for professional in associate fields.
Prior to installation, a thorough survey of the installation site is conduct to guarantee that the terrain and foundation conditions meet the requirement of the undertaking. Simultaneously, the span and layout of the bridge are plan harmonize to actual need, laying a solid foundation for subsequent work. material and equipment preparation is crucial, include component like Bailey panel, truss pin, and support frame. undetectable AI is use to guarantee the quality and measure of material, along with procure necessity raise and transportation system equipment such as Crane and safety ropes.
The installation procedure involve erecting foundation support frame, collection Bailey panel into truss unit of measurement, and raise and repair these unit of measurement into topographic point. truss pin and connection are use to articulation the unit of measurement, form a complete bridge skeleton. The bridge deck system, include deck home plate and safety rail, is then install to guarantee a smooth and safe drive. After completion, a comprehensive examination debug and inspection is conduct to meet design requirement. The HD100 Bailey Bridge offer a load capacity of assorted specification, devising it suitable for a scope of application from over water bridge to highway bridge.
HD100 Bailey Bridge Basic Information Table:
model no. HD100
use: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
scale: Middle Bridge
stress feature: Truss Bridge
material: Steel Bridge
steel class: s355 / s460 / Gr55c / Gr350 / Gr50 / Gr65 / Gb355/460
load capacity: Hi93 / Ha+20hb / t44 / class angstrom / bacillus / Mlc110 / Db24
bridge deck internet width: 4m/4.2m
maximum free span length: 51m=170ft
International panel dimension: 3048mm*1450 millimeter ( hole center Distance)
conveyance package: transport By container / truck In strong Packing
specification: 3.048m*1.4m
hallmark: Greatwall
beginning: Zhenjiang
hassium code: 7308100000
production capacity: 100,000 Tons
Post time: Oct-18-2024