• page banner

OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We insist over the principle of enhancement of 'High high quality, Efficiency, Sincerity and Down-to-earth working approach' to offer you with superb assistance of processing for Capilano Suspension Bridge Price, Modular Girder Bridge, Fabricated Bridges, We welcome clients, enterprise associations and friends from all components from the earth to make contact with us and find cooperation for mutual positive aspects.
OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall Detail:

Specification

Product name: Compact-100 Bailey Bridge
Model alias:  321-type prefabricated highway steel bridge (Bailey Bridge)
Derivative models: CB100, Compact-100, British 321-Type Bailey Bridge.
Truss piece model: Type 321 Bailey Panel
Conventional size of truss piece: 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side)
Maximum span of steel bridge design: 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected)
Standard lane width of steel bridge: 4.2 meters single lane (also can be customized according to customer needs)
Load class: Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design: 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR
According to the difference of span and load, select the appropriate row. Contact us for free design.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 high-strength bolts
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc.
Installation takes time: 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions)
Installation requires workers: 6-8 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions)
Steel bridge features: Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

Product elements introduction

It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.

Product application

The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.

Product advantages


Product detail pictures:

OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures


Related Product Guide:

Good quality comes initial; company is foremost; small business is cooperation" is our business philosophy which is frequently observed and pursued by our business for OEM Factory for Bailey Bridge Boat For Sale - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall , The product will supply to all over the world, such as: Serbia, Thailand, United Arab Emirates, Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products, promote perfect services, cooperate for long-term and mutual benefits, firm a comprehensive mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
  • Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Melissa from Cyprus - 2017.03.07 13:42
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Cara from Japan - 2017.03.28 16:34