We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Top Suppliers China Steel Prefabricated Bridge, Are you still seeking for a high quality product that is in accordance together with your good corporation image while expanding your product or service range? Try out our high-quality solutions. Your choice will prove for being intelligent!
We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for China Bailey Bridges, Steel Bridge, Meanwhile, we’re building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective goods, promote perfect services, cooperate for long-term and mutual benefits, firm a comprehensive mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
Product name: | Compact-100 Bailey Bridge |
Model alias: | 321-type prefabricated highway steel bridge (Bailey Bridge) |
Derivative models: | CB100, Compact-100, British 321-Type Bailey Bridge. |
Truss piece model: | Type 321 Bailey Panel |
Conventional size of truss piece: | 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side) |
Maximum span of steel bridge design: | 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected) |
Standard lane width of steel bridge: | 4.2 meters single lane (also can be customized according to customer needs) |
Load class: | Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc. |
Design: | 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR According to the difference of span and load, select the appropriate row. Contact us for free design. |
Main material of steel bridge: | GB Q345B |
Connection pin material: | 30CrMnTi |
Connecting bolt grade: | 8.8 high-strength bolts |
Surface corrosion: | Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc. |
Bridge erection method: | Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc. |
Installation takes time: | 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions) |
Installation requires workers: | 6-8 (determined according to site conditions) |
Equipment required for installation: | Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions) |
Steel bridge features: | Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life |
Pass the certification: | ISO, CCIC, BV, SGS, CNAS, etc. |
Executive standard: | JT-T/728-2008 |
manufacturer: | Zhenjiang Great Wall Heavy Industry Technology Co., Ltd. |
Annual output: | 12000 tons |
It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.
The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.
We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Top Suppliers China Steel Prefabricated Bridge, Are you still seeking for a high quality product that is in accordance together with your good corporation image while expanding your product or service range? Try out our high-quality solutions. Your choice will prove for being intelligent!
Top Suppliers China Bailey Bridges, Steel Bridge, Meanwhile, we’re building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective goods, promote perfect services, cooperate for long-term and mutual benefits, firm a comprehensive mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.