• page banner

Professional Designed and User-friendly Urban flyover

Short Description:


Product Detail

Product Tags

Product introduction

The Urban flyover is a kind of construction that assists pedestrians to cross the road in modern cities. The construction of the overpass can completely separate the pedestrians and vehicles on the road, and ensure the smoothness of traffic and the safety of pedestrians.

Urban flyover (2)
Urban flyover (1)

Product advantages

1.Low cost
2. beautiful appearance
3.light fittings
4.quick assembly
5.interchangeable
6.detachable
7. long life

Urban flyover (1)

Product applications

The overpass realizes the complete separation of pedestrians and traffic flow, the safety of pedestrians is more guaranteed, and the movement of vehicles is more smooth. However, the cost of the overpass is lower and the construction period is shorter, and it will not affect the load-bearing capacity of the road. Now the large overpasses in cities are equipped with elevator installations, which is convenient for the elderly to use.

Specification

Product name: Urban flyover
nickname: Sidewalk; steel structure footbridge; urban footbridge; steel temporary bridge; temporary access road; temporary temporary bridge; Bailey footbridge;
model: Type 321; Type 200; Type GW D; Special steel trusses, etc.
Commonly used truss piece model: 321 type Bailey Panel , 200 type Bailey Panel ; GW D type Bailey Panel , etc.
The largest single span of steel bridge design: Around 60 meters
Standard lane width of steel bridge: 1.2 meters, 1.5 meters, 2 meters or customized according to requirements.
Load class: Crowd load or small vehicle traffic. Generally not more than 5 tons.
Design: According to the difference of span and load, select the appropriate row.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 grade high-strength bolts; 10.9 grade high-strength bolts.
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever pushing method; in-situ assembly method; mound construction method; hoisting method; floating method, etc.
Installation takes time: 3-7 sunny days after abutment and other conditions are met (determined according to bridge length and site conditions)
Installation requires workers: 5-6 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, welders, generators, etc. (Can be adjusted according to site conditions)
Steel bridge features: Low cost, beautiful appearance, light fittings, quick assembly, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

  • Previous:
  • Next: